Most homeowners think of "the permit" as a single document. In Ontario, a bathroom renovation can involve up to three separate approvals from different bodies:
| Approval | Issued By |
| Building permit | Your municipality’s building department |
| Plumbing permit | Your municipality, as part of the building permit or as a standalone application |
| ESA notification of work | The Electrical Safety Authority, a provincial body separate from your municipality |
The third one causes the most confusion. A building permit is not an electrical permit. You may need both, and a municipal inspector’s sign-off does not mean ESA has reviewed your wiring.
Relocating fixtures alone does not always trigger a building permit, but it does trigger a plumbing permit. If the relocation requires opening a wall or floor structure, both apply.
The licensed plumber doing the work normally takes out the plumbing permit. Confirm in writing who is responsible for it.
The Electrical Safety Authority calls it a notification of work, though almost everyone calls it an ESA permit. It must be filed before electrical work starts, or within 48 hours of starting. If you hire out electrical work in Ontario, it must legally be done by a Licensed Electrical Contractor, who files the notification. You cannot file it on their behalf. A notification is required for:
Like-for-like replacement, such as swapping a light fixture into the same box on the same circuit, generally does not need a notification.
| The practical reality: Almost every GTA bathroom renovation touches electrical beyond a simple swap. The Ontario Building Code requires bathroom mechanical ventilation, vanity lighting usually changes, and older homes often lack GFCI protection. The real question is not whether you need an ESA notification, but which parts of your scope require one. When the work passes, ESA issues a Certificate of Acceptance. Keep a copy, since your insurer and a future buyer’s lawyer may ask for it. |
A purely cosmetic refresh, with no fixture moves, no new wiring and no structural change, generally needs no approvals:
The moment a drain moves or a wire is extended, that changes.
The triggers do not change across the GTA. They come from provincial rules: the Building Code Act, the Ontario Building Code and the Ontario Electrical Safety Code. A wall is load-bearing in Brampton for the same reason it is in Whitby. What changes is what you pay and how long you wait.
| Municipality | Typical Planning Timeline |
| Toronto | Roughly 3 to 6 weeks; fees from the low hundreds to about $1,500 depending on scope and value |
| Mississauga and Brampton | Comparable fees, typically 3 to 5 weeks |
| Durham Region (Oshawa, Whitby, Ajax) | Often faster, around 2 to 4 weeks |
Ontario sets a 10 business day review period for a complete house permit application, but resubmissions, zoning questions and municipal workload often stretch the practical timeline. Fee schedules are updated regularly, so treat these as planning ranges and confirm current figures with your municipality. Every timeline assumes a complete submission. Incomplete drawings are the most common reason a bathroom permit sits in the queue for an extra month.
In a condo, municipal approval is only half the picture. Your condo corporation will almost certainly require its own approval package first, typically including a signed alteration agreement, contractor insurance certificates and scope drawings. Some restrict work to certain hours or seasons, and some prohibit relocating drains entirely because the stack serves the units below. Start with property management before you start with the city.
Under the Building Code Act, maximum fines reach $50,000 for an individual on a first offence and $100,000 for a subsequent one, with much higher ceilings for corporations. Those maximums are reserved for serious or repeat cases, and a first-time homeowner is more likely to face a fine in the low thousands. The fine is rarely the expensive part. What really costs money:
A contractor who suggests skipping a permit on a bathroom addition, fixture relocation or new circuit is trading their convenience for your risk. You are the one who owns the property when the inspector arrives.
At Maple Leaf Quality Renos, every required approval is identified during design, before a single tile is ordered. Building permits, plumbing permits and ESA notifications are managed in-house as part of your bathroom renovation, with inspections scheduled at the right stages so nothing is closed in before it is reviewed. Not sure which category your project falls into? Tell us what you want to change, and we will tell you exactly what it requires.